A pest control technician checking an air-conditioner pipe opening in an outside wall
What our clients rate us

Gecko control in Al Shubaikah Al Jadid Makkah

Al Shubaikah Al Jadid comprises Crown Prince schemes three and four in south Makkah, new villas standing among empty plots on wide streets along Al Laith Road and Non Muslims bypass. Building is scattered, empty land offers temporary shelter for scorpions and geckos before villas fill the lots. Wadi Uranah and its tributaries cross the low ground and hold water after rain, attracting small insects and scorpions.

  • Targeted, not broadcast

    Product goes into cracks and runways, never sprayed across open surfaces.

  • Told before we start

    What we will use, where it goes, and what to cover or move before we arrive.

  • A follow-up visit

    We return after the first treatment, because what survives it does not show on the day.

  • Homes and businesses

    Apartments and villas, and kitchens and stores that need a record of each visit.

Why they keep coming back in Al Shubaikah Al Jadid

Geckos and scorpions arrive from Wadi Uranah and open foundation pits during construction and rapidly occupy newly completed villas. The method is set out in full on our Gecko control service.

The first reason

Wadi Uranah and seasonal moisture and insect blooms

Wadi Uranah crosses the district and its tributaries collect water in low spots and pits after rain. This seasonal moisture creates ideal conditions for small insects and scorpions. When the wadi dries, insects, scorpions and geckos search for water and food in nearby villas and vacant land.

The second reason

Empty plots and scattered building with temporary shelter

Vacant land and scattered villas create large gaps and temporary shelter for geckos and scorpions before new villas fill the lots. Most land lies empty, so geckos can move easily from plot to plot until permanent housing fills the blanks.

The third reason

Surrounding mountains and natural wildlife refuges

Mountains surrounding the new district offer natural shelter for geckos, scorpions and rodents. As construction and development advance, these wild animals migrate towards new villas searching for water and food.

Al Shubaikah Al Jadid on the map

Al Shubaikah Al Jadid sits about 1.5 km from Al Falaq Al Jadid and about 3 km from Al Shamiyah Al Jadid.

Open in Google Maps
Before treatment

The food, the opening and the crevice decide the method

A newly developed area on high ground with vacant plots and scattered villas, Wadi Uranah tributaries retaining water after rain on low spots and mountains surrounding the district.

A small house gecko resting on a pale wall

The house gecko

The house gecko here arrives from vacant land and surrounding mountains and shelters in foundation pits and open land before villas are occupied.

An outdoor wall lamp lit after dark

Outdoor lighting

Exterior lighting on villas and roads attracts small insects from surrounding land, so geckos gather around light sources.

An insect screen on a window, seen close up

Window mesh

Large openings for air, electrical and water pipes in new villas provide direct gecko entry.

Air-conditioner pipes passing through an outside wall

The air-conditioner sleeve

Air conditioning vents before metal mesh screening allow geckos easy access into villas.

An electrical distribution board mounted on a wall

Meter boxes and electrical panels

External electrical panels and meter boxes offer gecko and scorpion shelter.

A garden wall with watered planting beside it

The garden and the irrigation

Surrounding land is damp after rain, attracting insects, geckos and scorpions in numbers.

How we work

  1. 1

    Inspect at night and find the source

    We come at the hour it is actually moving, and establish which wall face it is living on, which lights are gathering its food, the entry points and the crevices it wedges into by day.

  2. 2

    Treat the food source

    We treat the flying and crawling insects on the wall faces, around the perimeter and around the lighting. Once the food goes, the wall stops being worth staying on.

  3. 3

    Close the openings and clear the crevices

    We seal the air-conditioner sleeve, screen the vents and drain outlets, deal with the underside of doors, and place a repellent in the crevices and behind panels so they move out before anything is closed.

  4. 4

    The follow-up visit

    We come back once the glued eggs have hatched, check the seals held, and re-treat any wall face where activity has returned.

What gecko control includes

  • A technician inspecting with a flashlight

    A recorded night inspection

    Wall faces, lighting, entry points and egg sites, all established before anything is applied.

  • A spray nozzle in close detail

    Treating the insects on the walls

    Targeted treatment around lighting, windows and the building perimeter, because the food is what keeps it there.

  • A gloved hand applying bait into a joint

    Placed repellent in the crevices

    Behind panels, in wall joints and at the ceiling-void entries, where it sits out the day.

  • A metal floor drain

    Screening vents and drain openings

    Shafts, vents and the condensate outlet, which are entry points nobody looks at.

  • A clean kitchen counter after treatment

    Aftercare instructions

    Ventilation, what to cover, and the change to the outside lighting that stops the insects gathering again.

  • The visit report being written on a clipboard

    A scheduled follow-up

    A set date after the first treatment, a check on the seals and re-treatment of anything still active.

What is different about South Makkah Sub-Municipality

South Makkah sub municipality is the belt of Crown Prince schemes south of Al Ukayshiyah, along the Al Laith road and the extension of Ibrahim Al Khalil Road to the Fifth Ring Road and the Non Muslims bypass. Most of it is still bare: granted plots awaiting houses, new villas standing alone, open building sites and unfinished paving and drainage. Wadi Uranah and its tributaries cross the low ground and hold water after rain, hills close it in, and rodents, reptiles and scorpions shelter in stacked materials and foundation pits before the neighbourhoods fill up.

Questions about this district

Are geckos and scorpions a problem in newly built empty villas?

Yes, vacant land and open pits offer temporary shelter. Once construction is complete, geckos and scorpions will enter villas if not properly sealed.

Should we treat for geckos before or after the villa is built?

The best approach is staged treatment: treat the land before building and treat again when the villa is complete but before residents move in, then monitor and treat again if needed after heavy rain.

Does Wadi Uranah increase gecko and scorpion problems?

Yes, water after rain provides moisture and small insects, attracting geckos and scorpions. As the wadi dries, these animals migrate to villas searching for water.

How do we keep geckos out of completed new villas?

We focus on sealing all openings and cracks before residents move in, and monitor especially after rain when insects are abundant and animals are active.

Do the surrounding mountains provide shelter for geckos?

Yes, mountains offer natural shelter. As development and construction advance, geckos may migrate towards new villas.

Is treatment safe in new empty villas before residents arrive?

Yes, treating empty villas is completely safe. We recommend treatment just before residents move in.

How much does gecko control in Al Shubaikah Al Jadid cost?

It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Shubaikah Al Jadid.

Other services in Al Shubaikah Al Jadid

Other services we provide to residents of Al Shubaikah Al Jadid.

All services

Need gecko control in Al Shubaikah Al Jadid? Tell us what you saw and we will tell you what it needs

We reach Al Shubaikah Al Jadid at a time we agree, and you get the full cost before we start.

Call now +966 57 336 7012 WhatsApp