Termite control in Khadra Makkah
Khadra is a newly established district on King Faisal Road where construction is continuous and vacant plots sit between the new homes, making termite discovery harder and requiring precise tracking of mud tubes through the damp soil around exposed foundations.
-
Targeted, not broadcast
Product goes into cracks and runways, never sprayed across open surfaces.
-
Told before we start
What we will use, where it goes, and what to cover or move before we arrive.
-
A follow-up visit
We return after the first treatment, because what survives it does not show on the day.
-
Homes and businesses
Apartments and villas, and kitchens and stores that need a record of each visit.
Why they keep coming back in Khadra
Mud tubes appear frequently in new buildings whose foundations are not yet settled, and moisture from the construction work makes colonies more active. The method is set out in full on the full Termite control page.
Exposed foundations and waterlogged soil
Ongoing construction leaves foundations uncovered for weeks, and contractors move damp soil around the site. Termites settle quickly in these conditions, and mud tubes get tangled with temporary building networks, so we need a complete map before any treatment.
Gaps between new buildings
Vacant plots between apartment blocks give established colonies safe routes from one house to the next. Termites scatter parts of the colony into empty ground, so bait stations must cover a wider area than in completed districts.
Temporary drainage and open channels
Building work leaves open drainage channels running throughout the project, where water pools. This constant moisture raises termite activity, and treatment must focus on water entry points that shift as the build phases move forward.
Khadra on the map
Khadra sits about 2 km from Muad and about 3 km from Badr.
Open in Google MapsThe evidence that decides the treatment
A new district under continuous construction near the Haram boundary, where soil around new buildings is damp from contractor work and temporary drainage systems.
Mud tubes
Mud tubes start at temporary entry points around excavations and equipment, and early treatment stops them spreading to the foundations.
Shed wings
Shed termite wings may not be seen on a construction site because soil covers them, but they are a strong sign the colony is preparing to spread.
Hollow timber
Hollow timber starts in the temporary frames and scaffolding before it appears in the finished building.
The water source
The moisture source in Khadra is multiple: building networks, mixers, temporary drainage and groundwater in low lying areas.
Cellulose on the floor
Cellulose on the floor includes timber props, scaffolding and temporary shoring, and termites colonise it before it is taken away.
Joints and pipe entries
Joints and pipe entries at the early stage are fully open, so we focus treatment on surrounding them with toxic barrier.
How we work
-
1
Inspect and trace
We sound the timber and the skirting, take moisture readings, and follow the tubes to the point where they leave the soil. We also settle the species, because one that lives inside dry wood is not treated like one that lives in the ground.
-
2
Treat the soil around the building
A narrow trench at the footing and injection at regular spacing, so the treated band runs continuous with no gap to walk around.
-
3
Drill the joints, inject the timber
Small holes at spacing along the slab joints, the wall bases and the pipe entries, direct injection into the galleries inside the affected timber, then the holes are closed and made good.
-
4
Bait stations and monitoring
Stations in the soil carrying a slow-acting material the workers pass through the colony by mouth-to-mouth feeding, and we come back to read them, because an empty tube on a wall proves nothing on its own.
What termite control includes
-
A traced, recorded inspection
Sounding, moisture readings, tubes traced back to the soil, and the species settled before anything is applied.
-
A treated band at the perimeter
Trenching and injection at the footing, spaced so the band is continuous rather than a set of patches.
-
Joints and service penetrations
Slab joints, pipe entries and floor drains, which are the ways up through the concrete.
-
Bait stations in the soil
A slow material carried back through the colony by feeding exchange, rather than stopping the workers at the wall.
-
Aftercare instructions
What not to dig or water near the treated band, what to keep off the walls, and the ventilation time we set for your case.
-
Scheduled monitoring visits
Reading the stations, sounding the same timber again, and treating any new activity.
The character of Khadra
New development: ongoing construction and vacant plots between the homes
New development means high groundwater and disturbed soil, so termites exploit the excess moisture and numerous gaps. Treatment focuses on blocking access before colonies settle into the foundations.
Questions about this district
Can we treat termites before the building work finishes?
Yes, it is best to treat the site before termites settle into the foundations. We focus on soil around the excavations and water entry points, but the work needs monthly checks because construction opens new routes.
The vacant plots near us have termites: will they move into our new house?
High probability. Termites search for wood sources, and the temporary wooden frames and temporary structures attract them. We place bait stations round the site before construction is complete.
Does the moisture from building work make termite colonies more active?
Yes, excess moisture from mixers and temporary networks speeds colony activity. Good treatment includes fixing the temporary drainage and drying the soil around foundations.
When should I start protecting my new house from termites?
Right after the foundations are poured and before the timber frames go up. In Khadra you should start early because the surrounding plots are active, and early treatment gives long term protection.
Workers leave food scraps on site: do these attract termites?
Yes, and they attract other insects first which then become food for termites. We monitor site cleanliness as part of protection and place bait stations away from food areas to avoid interference.
Is early treatment enough or do I need a new survey after building finishes?
Early treatment stops immediate infestation, but once building is complete we do a full reassessment, because settled foundations and final drainage networks may need additional treatment.
How much does termite control in Khadra cost?
It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Khadra.
Other services in Khadra
Other services we provide to residents of Khadra.
-
Residential
Cockroach control
-
Residential
Bed bug control
-
Residential
Rodents and mice
-
Residential
Mosquito control
-
Residential
Fly control
-
Residential
Ant control
-
Residential
Gecko control
-
Residential
Scorpion control
-
Residential
Snake control
-
Residential
Flea control
-
Residential
Bird and pigeon control
-
Residential
Preventive treatment
-
Residential
Disinfection
-
Commercial
Annual contracts
-
Commercial
Restaurants and cafes
-
Commercial
Hotels and apartments
-
Commercial
Warehouses and factories
-
Commercial
Schools and nurseries
-
Commercial
Retail and malls
-
Commercial
Rest houses and farms
-
Commercial
Fumigation
-
Water tanks
Water tank cleaning
-
Water tanks
Water tank sterilization
-
Water tanks
Water tank sealing
-
Water tanks
Tank leak repair
Need termite control in Khadra? Tell us what you saw and we will tell you what it needs
We reach Khadra at a time we agree, and you get the full cost before we start.