Preventive treatment in Khadra Makkah
Khadra is a newly laid district on King Faisal Road where construction continues and apartment blocks are still going up. The dampness from exposed foundations and wet ground attracts insects before they can settle into the buildings themselves. Preventive treatment here stops the problem from becoming a permanent feature as the district develops.
-
Targeted, not broadcast
Product goes into cracks and runways, never sprayed across open surfaces.
-
Told before we start
What we will use, where it goes, and what to cover or move before we arrive.
-
A follow-up visit
We return after the first treatment, because what survives it does not show on the day.
-
Homes and businesses
Apartments and villas, and kitchens and stores that need a record of each visit.
Why they keep coming back in Khadra
Buildings under construction lack external barriers and their openings are wide. Insects move through these gaps from the surrounding site before the buildings are sealed and completed. The method is set out in full on the full Preventive treatment page.
Ongoing construction leaves open paths for insects
Excavations and exposed foundations in Khadra keep the soil damp, and incomplete buildings leave large gaps unfilled. Insects enter through these openings before the buildings can be closed off, so prevention starts at the open entry points themselves.
Vacant plots drive the external pressure
Many parcels of land in Khadra remain vacant or are being prepared for development, and insects gather there. A residual band at the base of the wall cuts their path before they climb into the home.
Moisture from new construction persists for months
New buildings, foundations and materials in Khadra dry slowly, so the ground stays wet. The preventive programme monitors this dampness through reading points and returns before insects can breed.
Khadra on the map
Khadra sits about 2 km from Muad and about 3 km from Badr.
Open in Google MapsWhat a preventive visit reads
The ground in Khadra stays wet from new foundations and open excavations, and the gaps between the growing buildings create open corridors for insects from the surrounding area.
The base of the outside wall
The base of the outside wall in Khadra sits close to damp ground and open excavations, so the residual band must be applied with care here.
Gaps and openings
Openings in buildings under construction are many and large, so sealing gaps is a core part of the programme before insects can settle.
Air conditioning condensate
New air conditioning units produce heavy condensate at first, and monitoring points track this dampness.
Floor drains
Floor drains in new buildings need close attention because the networks have not yet settled.
Irrigation against the wall
Irrigation in Khadra is limited now but gardens are being planned, so we monitor future irrigation points.
The monitoring points
Monitoring points show any activity at the base of the external wall before it moves upward inside.
How we work
-
1
The baseline survey
We walk the outside boundary and then the inside: gaps under doors, pipe runs, vents, condensate lines, drains, the bin area and the store, and we fix the monitoring points before anything is applied.
-
2
Close the routes
Mesh on the vents, the gap under the door dealt with, the sleeve around a pipe run closed, and water put back into the drain nobody uses. Exclusion saves a spray that would otherwise repeat forever.
-
3
The band and the placed product
A residual band at the base of the wall outside and around door and window openings, with placed product inside joints and closed voids where it is warranted, and no open spray across living surfaces.
-
4
The scheduled visit: read, renew, record
We read the points to see which side is under pressure, renew the band where sun or irrigation has taken it, aim the visit at what the coming season opens up, and write down what was found and what was used.
What the preventive programme includes
-
A survey, then a check every visit
Entry points, moisture sources and storage, recorded before anything is applied and revisited each time.
-
Monitoring points that get read
At the wall and floor junction, under sinks and in the store, checked on every visit rather than only the last one.
-
A renewed exterior band
At the wall base and around the openings, put back wherever sun or irrigation took it between visits.
-
Drains, water lines and waste
The water seal in the drains, the condensate line and the ground around the bins, which are the standing water and food sources.
-
Between the visits
What to keep dry, what to keep closed, and what is worth a call before the next date. Ventilation we tell you before the visit.
-
A scheduled visit and a record of each
An agreed date, what the points held, what was treated, and what changed since last time.
The character of Khadra
New development: ongoing construction and vacant plots between the homes
New development means high external pressure from vacant plots and ongoing building work. The programme focuses on stopping entry and continuous monitoring before insects can establish themselves in the new building.
Questions about this district
Do insects enter a new building while construction is still ongoing?
Yes, incomplete buildings with open openings attract insects from the surrounding site. Prevention starts early at the foundation gaps so that insects do not establish themselves before the building is fully closed.
Why are insects so common in areas under development?
Vacant plots, open excavations and damp foundations all provide food and shelter for insects. Khadra has many of these sources, so external pressure is high.
Are monitoring points useful in a district growing so fast?
Absolutely. The points tell you what pressure is building around your home as the season changes and construction continues. If readings rise in a given season visits increase; if they fall visits spread further apart.
Does the programme change when the district is finished building?
Yes, the programme evolves as the district develops. Once buildings are complete and dampness falls and pressure drops, visits gradually space out.
Can the external band remain effective when construction continues around it?
The band needs renewing if excavation or building work damages it. In Khadra we review the band at every visit and refresh it if needed.
How does treating a new district differ from treating a finished one?
A new district has more external pressure than internal, and the building itself lacks full protection. Preventive treatment focuses on stopping entry first, before insects have a chance to settle inside.
How much does preventive treatment in Khadra cost?
It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Khadra.
Other services in Khadra
Other services we provide to residents of Khadra.
-
Residential
Cockroach control
-
Residential
Bed bug control
-
Residential
Termite control
-
Residential
Rodents and mice
-
Residential
Mosquito control
-
Residential
Fly control
-
Residential
Ant control
-
Residential
Gecko control
-
Residential
Scorpion control
-
Residential
Snake control
-
Residential
Flea control
-
Residential
Bird and pigeon control
-
Residential
Disinfection
-
Commercial
Annual contracts
-
Commercial
Restaurants and cafes
-
Commercial
Hotels and apartments
-
Commercial
Warehouses and factories
-
Commercial
Schools and nurseries
-
Commercial
Retail and malls
-
Commercial
Rest houses and farms
-
Commercial
Fumigation
-
Water tanks
Water tank cleaning
-
Water tanks
Water tank sterilization
-
Water tanks
Water tank sealing
-
Water tanks
Tank leak repair
Need preventive treatment in Khadra? Tell us what you saw and we will tell you what it needs
We reach Khadra at a time we agree, and you get the full cost before we start.