A technician applying a lining coat to the inner wall of an emptied water tank
What our clients rate us

Water tank sealing in Al Sulaymaniyah Jeddah

Al Sulaymaniyah is a relatively new planned district with modern apartment blocks, villas and gated compounds. Tanks here are recently built but face water pressure, heat and humidity that cause cracking at joints and seams. Supply stations must serve a rapidly growing population.

  • Potable-rated materials

    Linings and disinfectants cleared for drinking water tanks, not general-purpose products.

  • You get the downtime first

    How many hours the tank is out of service, told before we start rather than after we finish.

  • A first-draw flush

    We run the first draw off after refilling, and the tank is not handed back until the water runs clear.

  • Ground and roof tanks

    Villas, apartment blocks and premises that need a written record of each visit.

Why the job is different in Al Sulaymaniyah

Buildings here are relatively recent with modern tanks, but intensive use, heat and humidity cause rapid wear at seams and joints. The method is set out in full on the full Water tank sealing page.

The first reason

Gated compounds and blocks demand high water pressure

Luxury gated compounds and new residential blocks need high pressure to supply every floor. Continuous high pressure causes leaks at joints and seams.

The second reason

Main pump station serves the whole district

The district's main pump station serves a rapidly growing population of thousands. Large tanks face constant pressure and any leak wastes significant water daily.

The third reason

Extreme heat causes concrete expansion and contraction

Concrete expands in extreme heat and contracts at night. This repeated movement causes small cracks in floors and walls that grow over time.

Landmarks of Al Sulaymaniyah

Access to Al Sulaymaniyah runs via King Abdullah Road, with the Haramain high-speed railway station sitting within the district as a major landmark anchor. The district is built around and extends on both sides of this central transport hub.

  • King Abdullah Road
  • Haramain High Speed Railway Station (Al Sulaymaniyah Station)
  • Sulaymaniyah Plaza
  • Al Sulaymaniyah District Park
  • Al Sulaymaniyah Health Centre
Before treatment

What we read before any material is opened

A planned residential district in eastern Jeddah on King Abdullah Road, bordered by Al Naseem, Al Fayha and Quwaizah. It contains contemporary villas, apartment blocks and gated compounds with modern infrastructure.

A fine crack running through a concrete wall

Cracking in the wall

Gaps between concrete joints leak from continuous pressure and heat expansion in large modern tanks.

The junction of a concrete floor and wall inside an empty tank

The floor to wall joint

Wall-to-floor joints need special protection because pressure concentrates there more than anywhere else.

A coating flaking away from a concrete surface

The condition of the old lining

Supply, outlet and vent pipes pass through tank walls and need extra protection from leaks and corrosion.

Limescale deposits inside a water pipe

Sediment and scale

Humidity and salt creep in from damp air and nearby drains, so sealing needs exterior protection too.

Water pipes passing through a concrete wall

The pipe entries

Fine cracks from heat expansion start small but grow fast under repeated pressure and temperature change.

A metal cover over a water tank opening

The hatch and the vent

Algae and bacterial growth happens faster in modern tanks that get more light through weak seams.

How we work

  1. 1

    Inspect with the tank empty

    We drain it and read the surface dry: whether the water leaves through a crack, a joint or a pipe collar, and what the outer face of the wall and the ceiling below are telling us. A level test with the valves closed separates a leaking tank from leaking pipework.

  2. 2

    Clean and prepare the substrate

    Sediment out, a high pressure wash, the loose old lining and the weak surface layer of the concrete taken back, then dried. The material grips sound substrate and nothing else.

  3. 3

    Make the cracks and joints good

    Cracks are chased out and filled with a repair mortar, a cove is formed where the floor meets the wall, and every pipe collar is treated on its own.

  4. 4

    Lining, fill test, sterilisation

    Successive coats, each run across the one beneath it, on the face the water touches. Then a full cure, a fill with the level watched, and sterilisation with the first fill run to waste before the tank returns to use.

What water tank sealing includes

  • A technician inspecting with a flashlight

    Finding where the water leaves

    Carried out drained and dry: cracks, joints, pipe collars and the outer face of the wall.

  • A metal floor drain

    Draining and sediment removal

    The last of the water and the settled layer on the floor come out, because a lining does not stick over sediment.

  • A gloved hand applying bait into a joint

    Cracks and joints made good

    The crack opened and filled, a cove formed at the floor to wall junction, and each pipe entry worked separately.

  • A spray nozzle in close detail

    Lining coats on the water face

    More than one coat, each crossing the one below, in material made for drinking water tanks rather than roof waterproofing.

  • A clean kitchen counter after treatment

    Curing, fill test and sterilisation

    The material is left to cure, the tank is filled and the level watched, then sterilised and the first fill run to waste. How long the cure takes follows the material and the weather, and we tell you before the date so you can plan around the supply.

  • The visit report being written on a clipboard

    A follow-up level check

    We come back once it is in service to read the level and check the outer face, because any remaining loss shows up then rather than on the day of the work.

What is different about Al Jamiah Sub-Municipality

Al Jamiah sub municipality spans the older south of Jeddah. Planned districts such as Al Fayha, Al Thaghr and Madain Al Fahd sit beside crowded popular quarters like the Nazlahs and Al Quraiyat, and beside cleared or clearing land in Ghulail, Petromin and Al Thaalibah awaiting redevelopment. Apartment buildings stand close together above dense runs of shops and restaurants along Old Makkah Road and Prince Majid Road. Drainage in the popular quarters is ageing, humid air drifts in from the port and refinery side to the west, and the flat low lying ground holds rainwater in narrow streets.

Questions about this district

Do modern tanks in Al Sulaymaniyah leak for different reasons than old quarters?

Yes very much. Modern tanks leak from high pressure and heat expansion, while old tanks leak from general weakness.

Does a tank leak affect water consumption across the whole district?

Yes. A leak in a main tank can waste thousands of litres daily.

Do gated compounds need different sealing than regular apartment blocks?

Yes. Compounds have dedicated tanks and higher water pressure. Sealing must be stronger to withstand the pressure.

Can we seal a tank without cutting water supply to residents completely?

It depends on tank size and structure. We may use a temporary alternate tank or seal the tank in stages.

How do you inspect large tanks at pump stations?

We empty it completely and inspect all walls and floors. We use advanced equipment to find fine cracks and weak spots.

Does a modern tank need regular maintenance after sealing?

Yes, annual inspection is important. High pressure and heat may cause new problems over time.

How much does water tank sealing in Al Sulaymaniyah cost?

It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Sulaymaniyah.

Nearby districts we cover

Other services in Al Sulaymaniyah

Other services we provide to residents of Al Sulaymaniyah.

All services

Need water tank sealing in Al Sulaymaniyah? Tell us what you saw and we will tell you what it needs

We reach Al Sulaymaniyah at a time we agree, and you get the full cost before we start.

Call now +966 57 336 7012 WhatsApp