A technician applying a lining coat to the inner wall of an emptied water tank
What our clients rate us

Water tank sealing in Al Taawun Jeddah

Al Taawun is a new suburb on Jeddah's southern edge, home to recent housing developments including the Ministry of Housing's Rawdat Al Taawun scheme, alongside rest houses and open land. Tanks here are relatively new but face early leaks from rapid construction, quick assembly and sandy soil that draws moisture upward.

  • Potable-rated materials

    Linings and disinfectants cleared for drinking water tanks, not general-purpose products.

  • You get the downtime first

    How many hours the tank is out of service, told before we start rather than after we finish.

  • A first-draw flush

    We run the first draw off after refilling, and the tank is not handed back until the water runs clear.

  • Ground and roof tanks

    Villas, apartment blocks and premises that need a written record of each visit.

Why the job is different in Al Taawun

Buildings here were built in the last fifteen years and most tanks show signs of minor to moderate leaks within two to four years of installation. The method is set out in full on our Water tank sealing service.

The first reason

New tanks from rapid construction

Most tanks here are recent but built at rapid pace without full concrete curing. Leaks start at the tank base where the floor meets the wall, and sandy soil pulls moisture upward from below.

The second reason

Sandy soil and high water table

Al Taawun sits on low ground with absorbent sandy soil. The water table is very close to the surface, increasing hydrostatic pressure on the tank base from outside.

The third reason

Rest houses demand large tanks with heavy cyclic use

Hospitality buildings operate large tanks with daily filling and draining. Repeated mechanical stress weakens the internal coating and opens fine cracks.

The character of Al Taawun

New development: ongoing construction and vacant plots between the homes

The district is new development, meaning most tanks are recent but built quickly without full curing. Sandy soil and high water table increase external pressure on tanks, so sealing here focuses on base and joint reinforcement before lining.

Before treatment

What we read before any material is opened

A new-development district on the Jeddah to Al Laith Road south of the city, bounded by Al Khumrah to the east and Al Sanabil to the north, with Al Hussein ibn Ali Street running through it and housing projects mixed with hospitality buildings and vacant land.

A fine crack running through a concrete wall

Cracking in the wall

Base inspection focuses on flaking original coating and rising damp from beneath the concrete, especially at corners.

The junction of a concrete floor and wall inside an empty tank

The floor to wall joint

Joint inspection reveals fine cracks between floor and walls that have opened from repeated mechanical stress.

A coating flaking away from a concrete surface

The condition of the old lining

Pipe entries show leaks around penetration points because the original seal was not fully cured.

Limescale deposits inside a water pipe

Sediment and scale

Moisture from the water table is visible on the lower tank exterior and interior.

Water pipes passing through a concrete wall

The pipe entries

Wall cracks start fine but grow rapidly from cyclic pressure and groundwater.

A metal cover over a water tank opening

The hatch and the vent

Discolouration and deposits on interior walls signal early chemical reaction between water and exposed concrete.

How we work

  1. 1

    Inspect with the tank empty

    We drain it and read the surface dry: whether the water leaves through a crack, a joint or a pipe collar, and what the outer face of the wall and the ceiling below are telling us. A level test with the valves closed separates a leaking tank from leaking pipework.

  2. 2

    Clean and prepare the substrate

    Sediment out, a high pressure wash, the loose old lining and the weak surface layer of the concrete taken back, then dried. The material grips sound substrate and nothing else.

  3. 3

    Make the cracks and joints good

    Cracks are chased out and filled with a repair mortar, a cove is formed where the floor meets the wall, and every pipe collar is treated on its own.

  4. 4

    Lining, fill test, sterilisation

    Successive coats, each run across the one beneath it, on the face the water touches. Then a full cure, a fill with the level watched, and sterilisation with the first fill run to waste before the tank returns to use.

What water tank sealing includes

  • A technician inspecting with a flashlight

    Finding where the water leaves

    Carried out drained and dry: cracks, joints, pipe collars and the outer face of the wall.

  • A metal floor drain

    Draining and sediment removal

    The last of the water and the settled layer on the floor come out, because a lining does not stick over sediment.

  • A gloved hand applying bait into a joint

    Cracks and joints made good

    The crack opened and filled, a cove formed at the floor to wall junction, and each pipe entry worked separately.

  • A spray nozzle in close detail

    Lining coats on the water face

    More than one coat, each crossing the one below, in material made for drinking water tanks rather than roof waterproofing.

  • A clean kitchen counter after treatment

    Curing, fill test and sterilisation

    The material is left to cure, the tank is filled and the level watched, then sterilised and the first fill run to waste. How long the cure takes follows the material and the weather, and we tell you before the date so you can plan around the supply.

  • The visit report being written on a clipboard

    A follow-up level check

    We come back once it is in service to read the level and check the outer face, because any remaining loss shows up then rather than on the day of the work.

What is different about South Sub-Municipality

The South sub municipality runs from the edge of Old Makkah Road down to Al Khumrah and the southern corniche. Dense residential districts sit beside new subdivisions such as Al Sanabil and Al Taawun, warehouse fringes such as Al Saruriyah and Al Sarawat, and an old seaside settlement at Al Quzayn. Open stormwater channels cross the housing, and the warehouses, the vegetable and livestock markets and the nearby Islamic Port and Industrial City give pests shelter, food and year round humidity. Pressure is greatest in the older quarters, where drainage networks are ageing.

Questions about this district

Why do new tanks leak quickly in Al Taawun?

Rapid building means concrete is not fully cured before use. Sandy soil and high water table apply outward pressure on the base, accelerating leaks.

Is the leak coming from inside or outside the tank?

Mostly from below and outside. Water enters beneath the tank where the base meets the walls, not through the walls themselves.

Does a new tank need sealing right away?

If moisture stains or minor leaks appear in the first or second year, yes, it should be treated before it worsens.

Does pressure from repeated filling and draining cause cracks?

Yes, repeated mechanical stress accelerates fine cracks, especially at the floor-to-wall joint.

How do we handle large tanks in rest houses?

We focus on strengthening joints and the base and add mechanical reinforcement before applying the final lining.

Will sealing stop leaks from the water table?

Yes if the lining is tight and well adhered. But the soil and drainage around the tank base must also be checked from outside.

How much does water tank sealing in Al Taawun cost?

It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Taawun.

Nearby districts we cover

Other services in Al Taawun

Other services we provide to residents of Al Taawun.

All services

Need water tank sealing in Al Taawun? Tell us what you saw and we will tell you what it needs

We reach Al Taawun at a time we agree, and you get the full cost before we start.

Call now +966 57 336 7012 WhatsApp