Gecko control in Harat Al Bab Wa Al Shamiyah Makkah
Harat Al Bab Wa Al Shamiyah lies immediately north of the Grand Mosque, with the Rua Al Haram scheme building under Jabal Hindi and the northern expansion active. Excavated ground and open sites provide permanent moisture and insects, whilst the old buildings nearby hold deep cracks. The gecko hunts at night wherever light, food and shelter meet.
-
Targeted, not broadcast
Product goes into cracks and runways, never sprayed across open surfaces.
-
Told before we start
What we will use, where it goes, and what to cover or move before we arrive.
-
A follow-up visit
We return after the first treatment, because what survives it does not show on the day.
-
Homes and businesses
Apartments and villas, and kitchens and stores that need a record of each visit.
Why they keep coming back in Harat Al Bab Wa Al Shamiyah
The gecko here takes advantage of the disruption and instability, moving with the shifting gaps and cracks that the ongoing construction continuously opens. The method is set out in full on our Gecko control service.
Ongoing construction creates ideal gecko habitat
Excavated ground and open sites provide constant moisture and abundant insects. The gecko establishes in new foundations and building openings, then climbs at night into the adjoining structures.
Old buildings beside new construction offer stable shelter
Older buildings near the new work hold deep settled cracks. The gecko enters from the new sites and retreats into the old established cracks.
Ground movement and ongoing work open new gaps continuously
Ground movement, ongoing construction, vibration and pressure create new cracks in foundations and walls. A single treatment cannot seal every newly opened gap.
The character of Harat Al Bab Wa Al Shamiyah
New development: ongoing construction and vacant plots between the homes
New development means openings and cracks appear and change continuously as construction proceeds. The gecko does not settle in one place; instead it moves with each new opening, requiring ongoing surveillance rather than a single treatment.
The food, the opening and the crevice decide the method
The quarter is under continuous construction with excavated ground and open construction sites. New and old foundations crack and separate under ground movement.
The house gecko
The house gecko in new Al Shamiyah establishes in building openings and new foundations, climbing into the old buildings at night.
Outdoor lighting
Lighting on construction sites and nearby buildings draws heavy insect traffic, providing the gecko with constant food.
Window mesh
Mesh and screens in old buildings are close to the excavated sites, allowing gecko entry.
The air-conditioner sleeve
Air conditioning and service pipes in new and old buildings provide vertical routes for geckos between floors.
Meter boxes and electrical panels
Electrical panels on new sites and in adjacent buildings attract insects and geckos.
The garden and the irrigation
Parks and irrigation around the Grand Mosque and building sites provide continuing moisture and insects.
How we work
-
1
Inspect at night and find the source
We come at the hour it is actually moving, and establish which wall face it is living on, which lights are gathering its food, the entry points and the crevices it wedges into by day.
-
2
Treat the food source
We treat the flying and crawling insects on the wall faces, around the perimeter and around the lighting. Once the food goes, the wall stops being worth staying on.
-
3
Close the openings and clear the crevices
We seal the air-conditioner sleeve, screen the vents and drain outlets, deal with the underside of doors, and place a repellent in the crevices and behind panels so they move out before anything is closed.
-
4
The follow-up visit
We come back once the glued eggs have hatched, check the seals held, and re-treat any wall face where activity has returned.
What gecko control includes
-
A recorded night inspection
Wall faces, lighting, entry points and egg sites, all established before anything is applied.
-
Treating the insects on the walls
Targeted treatment around lighting, windows and the building perimeter, because the food is what keeps it there.
-
Placed repellent in the crevices
Behind panels, in wall joints and at the ceiling-void entries, where it sits out the day.
-
Screening vents and drain openings
Shafts, vents and the condensate outlet, which are entry points nobody looks at.
-
Aftercare instructions
Ventilation, what to cover, and the change to the outside lighting that stops the insects gathering again.
-
A scheduled follow-up
A set date after the first treatment, a check on the seals and re-treatment of anything still active.
Landmarks of Harat Al Bab Wa Al Shamiyah
Treatment in Al Shamiyah follows Jabal Hindi where the northern expansion and excavations are active, then traces towards the Khalid ibn Al Walid Mosque where older buildings and deep cracks shelter the established gecko population.
- The Grand Mosque
- Northern expansion courtyards
- Jabal Hindi
- Rua Al Haram project
- Khalid ibn Al Walid Mosque
Questions about this district
Does ongoing construction make gecko control impossible to manage?
Construction makes treatment more complex, not impossible. We focus on known foundations and openings, and return after each construction phase completes.
How often must we treat a district under continuous building?
Initial treatment targets excavated ground and nearby buildings. After that we monitor every two months and retreat when new geckos appear.
Are new construction openings better gecko shelter than old cracks?
New openings are wet and exposed, whilst old cracks are deep and settled. The gecko prefers old cracks for stable day refuge.
Does moisture from excavation increase gecko and insect numbers?
Yes; open excavations provide permanent moisture that attracts insects, and those insects draw and sustain geckos.
Are new buildings in the scheme less exposed than the old ones?
New buildings have open construction gaps and fresh cracks, whilst old ones have deep settled cracks. Both are exposed but in different ways.
How do we treat open building sites in a developing quarter?
We treat excavation edges and new foundations, and focus on the paths the gecko uses to reach the standing buildings.
How much does gecko control in Harat Al Bab Wa Al Shamiyah cost?
It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Harat Al Bab Wa Al Shamiyah.
Nearby districts we cover
Other services in Harat Al Bab Wa Al Shamiyah
Other services we provide to residents of Harat Al Bab Wa Al Shamiyah.
-
Residential
Cockroach control
-
Residential
Bed bug control
-
Residential
Termite control
-
Residential
Rodents and mice
-
Residential
Mosquito control
-
Residential
Fly control
-
Residential
Ant control
-
Residential
Scorpion control
-
Residential
Snake control
-
Residential
Flea control
-
Residential
Bird and pigeon control
-
Residential
Preventive treatment
-
Residential
Disinfection
-
Commercial
Annual contracts
-
Commercial
Restaurants and cafes
-
Commercial
Hotels and apartments
-
Commercial
Warehouses and factories
-
Commercial
Schools and nurseries
-
Commercial
Retail and malls
-
Commercial
Rest houses and farms
-
Commercial
Fumigation
-
Water tanks
Water tank cleaning
-
Water tanks
Water tank sterilization
-
Water tanks
Water tank sealing
-
Water tanks
Tank leak repair
Need gecko control in Harat Al Bab Wa Al Shamiyah? Tell us what you saw and we will tell you what it needs
We reach Harat Al Bab Wa Al Shamiyah at a time we agree, and you get the full cost before we start.