Water tank sealing in East Al Sulaymaniyah Jeddah
East Al Sulaymaniyah occupies the eastern section of Al Sulaymaniyah near Haramain Road and the Haramain high-speed rail station, with apartment buildings, villas and commercial shops. Buildings are medium density under Umm Al Salam sub municipality, and tanks face high usage pressure from residents and retail users. Ground level changes and recent urban expansion stress older shared tanks.
-
Potable-rated materials
Linings and disinfectants cleared for drinking water tanks, not general-purpose products.
-
You get the downtime first
How many hours the tank is out of service, told before we start rather than after we finish.
-
A first-draw flush
We run the first draw off after refilling, and the tank is not handed back until the water runs clear.
-
Ground and roof tanks
Villas, apartment blocks and premises that need a written record of each visit.
Why the job is different in East Al Sulaymaniyah
Tanks in East Al Sulaymaniyah are relatively old and carry heavy usage pressure from a growing resident population and commercial frontages facing King Abdullah Road. The method is set out in full on how we approach Water tank sealing.
Shared tanks in dense apartment blocks
Dense residential buildings in East Al Sulaymaniyah share large underground tanks. These tanks carry heavy water pressure from large resident populations, and multiple pipes and numerous entry points increase leak risk.
Tanks near the rail station
Tanks near the Haramain high-speed station face vibrations from train movement and thermal expansion. Vibrations cause fine cracks in concrete and fractures at joints.
Commercial tanks on King Abdullah Road
Shops, restaurants and offices facing King Abdullah Road require large capacity tanks. These tanks face heavy use and variable water pressure due to fluctuating demand during business hours.
East Al Sulaymaniyah on the map
East Al Sulaymaniyah sits about 3 km from Al Nakhil and about 4.5 km from Al Muntazahat.
Open in Google MapsWhat we read before any material is opened
The eastern portion of Al Sulaymaniyah near Haramain Road and the Haramain high-speed rail station, containing apartment buildings, villas and commercial shops. Medium-density housing under Umm Al Salam sub municipality, bordered by Al Nakhil to the north and Abruq Al Raghamah to the south.
Cracking in the wall
Inspection of vibration-caused cracks in tank walls, especially the many fine cracks that appear years after proximity to the rail station.
The floor to wall joint
Testing of multiple pipe joints in large shared tanks, which may have dozens of entry points.
The condition of the old lining
Assessment of concrete condition and foundations beneath the tank, determining whether vibrations have weakened infrastructure.
Sediment and scale
Evaluation of capacity and pressure in shared tanks to ensure pipes and pumps handle full load.
The pipe entries
Search for old leakage staining on foundations and floors around the tank.
The hatch and the vent
Full tank testing under load before and after sealing to confirm no new leaks develop.
How we work
-
1
Inspect with the tank empty
We drain it and read the surface dry: whether the water leaves through a crack, a joint or a pipe collar, and what the outer face of the wall and the ceiling below are telling us. A level test with the valves closed separates a leaking tank from leaking pipework.
-
2
Clean and prepare the substrate
Sediment out, a high pressure wash, the loose old lining and the weak surface layer of the concrete taken back, then dried. The material grips sound substrate and nothing else.
-
3
Make the cracks and joints good
Cracks are chased out and filled with a repair mortar, a cove is formed where the floor meets the wall, and every pipe collar is treated on its own.
-
4
Lining, fill test, sterilisation
Successive coats, each run across the one beneath it, on the face the water touches. Then a full cure, a fill with the level watched, and sterilisation with the first fill run to waste before the tank returns to use.
What water tank sealing includes
-
Finding where the water leaves
Carried out drained and dry: cracks, joints, pipe collars and the outer face of the wall.
-
Draining and sediment removal
The last of the water and the settled layer on the floor come out, because a lining does not stick over sediment.
-
Cracks and joints made good
The crack opened and filled, a cove formed at the floor to wall junction, and each pipe entry worked separately.
-
Lining coats on the water face
More than one coat, each crossing the one below, in material made for drinking water tanks rather than roof waterproofing.
-
Curing, fill test and sterilisation
The material is left to cure, the tank is filled and the level watched, then sterilised and the first fill run to waste. How long the cure takes follows the material and the weather, and we tell you before the date so you can plan around the supply.
-
A follow-up level check
We come back once it is in service to read the level and check the outer face, because any remaining loss shows up then rather than on the day of the work.
The character of East Al Sulaymaniyah
Mixed district: shops at street level with homes above them
East Al Sulaymaniyah is a medium-density district combining apartment blocks, villas and commercial shops, meaning tank sizes and uses vary. Proximity to the Haramain rail station complicates maintenance because vibrations cause additional cracking, and shared tanks need sealing strong enough to withstand continuous pressure and vibration.
Questions about this district
Do vibrations from the rail station cause cracks in tanks?
Yes. Continuous vibrations from train movement stress concrete and cause fine cracks. Tanks near the station face higher risk than others.
Is a shared tank cheaper than individual tanks?
Shared tanks may be cheaper for routine maintenance, but if a leak or fault occurs, repair affects all residents.
What drives the cost of sealing a shared tank in East Al Sulaymaniyah?
Cost depends on tank size and sealing area. Large shared tanks can require significant investment.
Can a tank be sealed without cutting off water to residents?
No. The tank must be completely empty. Residents will need water from backup tanks or temporary cisterns during sealing.
What happens if a full tank develops a leak?
It must be emptied immediately and sealed. Leakage can weaken foundations or cause collapse in rare cases.
Do new buildings in the area have better tanks?
Yes. Modern buildings require tanks with modern sealing. But after 5 years, even new tanks need inspection.
How much does water tank sealing in East Al Sulaymaniyah cost?
It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach East Al Sulaymaniyah.
Nearby districts we cover
Other services in East Al Sulaymaniyah
Other services we provide to residents of East Al Sulaymaniyah.
-
Water tanks
Water tank cleaning
-
Water tanks
Water tank sterilization
-
Water tanks
Tank leak repair
-
Residential
Cockroach control
Need water tank sealing in East Al Sulaymaniyah? Tell us what you saw and we will tell you what it needs
We reach East Al Sulaymaniyah at a time we agree, and you get the full cost before we start.