A technician applying a lining coat to the inner wall of an emptied water tank
What our clients rate us

Water tank sealing in Al Buhayrat Makkah

Al Buhayrat is a new north western extension of the city between An Nawwariyah and As Salamah, close to At Tanim and the northern Haram boundary. New villas and apartment blocks stand among plots still under construction. Tanks are installed in buildings, some new and some still under construction. New tanks may leak from day one because concrete has not cured properly or construction was too fast.

  • Potable-rated materials

    Linings and disinfectants cleared for drinking water tanks, not general-purpose products.

  • You get the downtime first

    How many hours the tank is out of service, told before we start rather than after we finish.

  • A first-draw flush

    We run the first draw off after refilling, and the tank is not handed back until the water runs clear.

  • Ground and roof tanks

    Villas, apartment blocks and premises that need a written record of each visit.

Why the job is different in Al Buhayrat

Construction is ongoing and tanks are installed in new buildings and buildings under construction, with concrete used being fast-set and not fully cured before use. The method is set out in full on what Water tank sealing involves.

The first reason

Tanks in new and under-construction buildings

New villas and apartment blocks install tanks from the start. Some buildings are still under construction and tanks are installed before foundations and reinforcement finish.

The second reason

Fast concrete and fast construction

Contractors use fast-set concrete mixes to accelerate building. Tanks are filled and used before concrete fully cures, and cracks appear quickly.

The third reason

Moisture from new building foundations and empty plots

Empty plots and land surrounded by new construction retain high moisture. New foundations are not yet dry and water penetrates the tank from outside.

The character of Al Buhayrat

Mixed district: shops at street level with homes above them

Al Buhayrat is a new mixed quarter with very fast construction. Tanks sit in new buildings and concrete and linings are not yet mature. Sealing here must address construction faults and surrounding moisture together, not just surface cracks.

Before treatment

What we read before any material is opened

A north western extension between An Nawwariyah to the north and As Salamah to the south, close to At Tanim and the northern Haram boundary. New apartment blocks and villas on mixed plots still under construction, served by Hira General Hospital, the At Tanim walkway, mosques and schools.

A fine crack running through a concrete wall

Cracking in the wall

Fresh concrete leaves large pores and fine cracks because the mix is fast-set and water has not yet evaporated.

The junction of a concrete floor and wall inside an empty tank

The floor to wall joint

Joints between tank and foundation and pipes are very weak because construction is fast and initial sealing is absent.

A coating flaking away from a concrete surface

The condition of the old lining

Moisture from surrounding land and damp foundations presses the tank from outside and water seeps inward.

Limescale deposits inside a water pipe

Sediment and scale

New lining or absence of lining causes leaks from both inside and outside.

Water pipes passing through a concrete wall

The pipe entries

Fine cracks in fresh concrete seep slowly at first but widen over time and under pressure.

A metal cover over a water tank opening

The hatch and the vent

Water in the new tank may be cloudy or hold debris because lining is weak and concrete is crumbling.

How we work

  1. 1

    Inspect with the tank empty

    We drain it and read the surface dry: whether the water leaves through a crack, a joint or a pipe collar, and what the outer face of the wall and the ceiling below are telling us. A level test with the valves closed separates a leaking tank from leaking pipework.

  2. 2

    Clean and prepare the substrate

    Sediment out, a high pressure wash, the loose old lining and the weak surface layer of the concrete taken back, then dried. The material grips sound substrate and nothing else.

  3. 3

    Make the cracks and joints good

    Cracks are chased out and filled with a repair mortar, a cove is formed where the floor meets the wall, and every pipe collar is treated on its own.

  4. 4

    Lining, fill test, sterilisation

    Successive coats, each run across the one beneath it, on the face the water touches. Then a full cure, a fill with the level watched, and sterilisation with the first fill run to waste before the tank returns to use.

What water tank sealing includes

  • A technician inspecting with a flashlight

    Finding where the water leaves

    Carried out drained and dry: cracks, joints, pipe collars and the outer face of the wall.

  • A metal floor drain

    Draining and sediment removal

    The last of the water and the settled layer on the floor come out, because a lining does not stick over sediment.

  • A gloved hand applying bait into a joint

    Cracks and joints made good

    The crack opened and filled, a cove formed at the floor to wall junction, and each pipe entry worked separately.

  • A spray nozzle in close detail

    Lining coats on the water face

    More than one coat, each crossing the one below, in material made for drinking water tanks rather than roof waterproofing.

  • A clean kitchen counter after treatment

    Curing, fill test and sterilisation

    The material is left to cure, the tank is filled and the level watched, then sterilised and the first fill run to waste. How long the cure takes follows the material and the weather, and we tell you before the date so you can plan around the supply.

  • The visit report being written on a clipboard

    A follow-up level check

    We come back once it is in service to read the level and check the outer face, because any remaining loss shows up then rather than on the day of the work.

What is different about Al Umrah Sub-Municipality

Al Umrah sub municipality covers the north west of Makkah along the Madinah road and the old Jeddah road, from At Tanim and Masjid Aisha to An Nawwariyah. Its districts are the city's newest, villas and apartment blocks raised on wide schemes where large tracts in Al Umrah Al Jadidah, Al Fayha and Al Buhayrat remain vacant or under construction. Wadi Saraf and Wadi At Tanim run through it and rainwater gathers on unfinished schemes, ihram shops, restaurants and coach stops along the Madinah road serve a constant flow of pilgrims, and villas fill Al Hamra and Umm Al Jud.

Questions about this district

Why does a new tank leak immediately?

Concrete has not fully cured and construction was rushed. The tank is filled too early and cracks appear under first pressure.

Does a new tank need treatment right after installation?

Yes. The new tank must be treated, cleaned and sterilised before first use, because fresh concrete may leak.

How long to wait before filling a new tank?

Usually two to three weeks after pouring, until concrete fully cures.

Does surrounding moisture cause leaks?

Yes. If land around the tank is damp and foundations not yet dry, water presses the tank from outside.

Can a tank be repaired during construction?

Difficult. The site is busy with workers and equipment. Better to repair after building finishes and the site is clear.

Does new sealing protect against old construction faults?

Partly. Good sealing protects against cracks and moisture but if concrete is very weak, leaks may return in two or three years.

How much does water tank sealing in Al Buhayrat cost?

It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Buhayrat.

Nearby districts we cover

Other services in Al Buhayrat

Other services we provide to residents of Al Buhayrat.

All services

Need water tank sealing in Al Buhayrat? Tell us what you saw and we will tell you what it needs

We reach Al Buhayrat at a time we agree, and you get the full cost before we start.

Call now +966 57 336 7012 WhatsApp