A technician applying a lining coat to the inner wall of an emptied water tank
What our clients rate us

Water tank sealing in Al Zumurrud Jeddah

Al Zumurrud is a northern coastal district on the Red Sea with new villas, apartments and residential-commercial plots. Tanks are exposed to high marine humidity and salt-laden air. Moist salt air accelerates corrosion of tank walls and metal pipes, and leaks here result not just from cracks but from chemical erosion.

  • Potable-rated materials

    Linings and disinfectants cleared for drinking water tanks, not general-purpose products.

  • You get the downtime first

    How many hours the tank is out of service, told before we start rather than after we finish.

  • A first-draw flush

    We run the first draw off after refilling, and the tank is not handed back until the water runs clear.

  • Ground and roof tanks

    Villas, apartment blocks and premises that need a written record of each visit.

Why the job is different in Al Zumurrud

Tanks here face very high marine humidity and salt-laden air; metal rusts quickly and concrete erodes faster than in inland areas. The method is set out in full on how we approach Water tank sealing.

The first reason

Sea salt erodes concrete and metal

Coastal air carries continuous salt spray. Tank walls erode from the outside and metal pipes rust inside very rapidly.

The second reason

High humidity accelerates cracking and leaks

Relative humidity here is 80 per cent or more year-round. Water penetrates small cracks easily and leaks begin very early even in new tanks.

The third reason

Chalets and resorts need extra protection

Beachfront chalets and rest houses need heavily protected tanks. Salt water may spray directly onto the external tank surface, and sealant must be very strong.

The character of Al Zumurrud

Coastal area: high humidity and salt air through the year

A coastal district with new villas and apartments means tanks are relatively new but salt and humidity accelerate their degradation. Sealing here is not optional but essential immediately after installation, and sealant materials must be specialised for coastal environment.

Before treatment

What we read before any material is opened

A northern coastal district on the Red Sea with recent villas and apartments and residential and commercial plots, bordered by the sea to the west, Al Lulu and Al Yaqut to the south and Al Sawari to the east, with chalets and rest houses along its shore.

A fine crack running through a concrete wall

Cracking in the wall

Water inside the tank may contain traces of salt-laden air, requiring advanced cleaning and filtration before sealing.

The junction of a concrete floor and wall inside an empty tank

The floor to wall joint

Floor and walls need inspection for concrete erosion from salt, not just cracks but material loss itself.

A coating flaking away from a concrete surface

The condition of the old lining

Internal metal pipes and fittings may be rusted inside; corrosion may spread to joints and connections.

Limescale deposits inside a water pipe

Sediment and scale

High humidity year-round means water penetrates any crack very rapidly; leaks do not wait for summer.

Water pipes passing through a concrete wall

The pipe entries

The external tank surface may be coated with accumulated salt spray; external sealant must resist this accumulation.

A metal cover over a water tank opening

The hatch and the vent

A tank exposed to coastal air needs more frequent inspection checks than tanks in inland areas.

How we work

  1. 1

    Inspect with the tank empty

    We drain it and read the surface dry: whether the water leaves through a crack, a joint or a pipe collar, and what the outer face of the wall and the ceiling below are telling us. A level test with the valves closed separates a leaking tank from leaking pipework.

  2. 2

    Clean and prepare the substrate

    Sediment out, a high pressure wash, the loose old lining and the weak surface layer of the concrete taken back, then dried. The material grips sound substrate and nothing else.

  3. 3

    Make the cracks and joints good

    Cracks are chased out and filled with a repair mortar, a cove is formed where the floor meets the wall, and every pipe collar is treated on its own.

  4. 4

    Lining, fill test, sterilisation

    Successive coats, each run across the one beneath it, on the face the water touches. Then a full cure, a fill with the level watched, and sterilisation with the first fill run to waste before the tank returns to use.

What water tank sealing includes

  • A technician inspecting with a flashlight

    Finding where the water leaves

    Carried out drained and dry: cracks, joints, pipe collars and the outer face of the wall.

  • A metal floor drain

    Draining and sediment removal

    The last of the water and the settled layer on the floor come out, because a lining does not stick over sediment.

  • A gloved hand applying bait into a joint

    Cracks and joints made good

    The crack opened and filled, a cove formed at the floor to wall junction, and each pipe entry worked separately.

  • A spray nozzle in close detail

    Lining coats on the water face

    More than one coat, each crossing the one below, in material made for drinking water tanks rather than roof waterproofing.

  • A clean kitchen counter after treatment

    Curing, fill test and sterilisation

    The material is left to cure, the tank is filled and the level watched, then sterilised and the first fill run to waste. How long the cure takes follows the material and the weather, and we tell you before the date so you can plan around the supply.

  • The visit report being written on a clipboard

    A follow-up level check

    We come back once it is in service to read the level and check the outer face, because any remaining loss shows up then rather than on the day of the work.

What is different about Dhahban Sub-Municipality

Dhahban sub municipality is the northern coastal strip of Jeddah, running from the north bank of Sharm Obhur up to the old village of Dhahban and Salman Bay. Its districts are recently built, with owner occupied villas and apartments, beach resorts and chalets on the shore, and land subdivisions still being developed. Nearness to the sea keeps humidity high all year, irrigated lawns in villas, resorts and district parks hold water, Wadi Obhur and the vacant plots between buildings give rodents and reptiles shelter, and the old fishing village of Dhahban gives the far north a rural edge.

Questions about this district

Does sea salt affect tanks even if they are set back from the shoreline?

Yes severely. Salt is carried in the air and settles on the tank exterior continuously, speeding erosion.

Why do metal pipes in coastal tanks rust so quickly?

Humidity and salt penetrate the metal from inside and outside together, and rust blocks pipes and weakens them.

Is one sealing layer enough to protect against salt and humidity?

It may not be. We may need strong internal sealant plus external protection against salt and moisture together.

Do new tanks in Al Zumurrud need different sealing than tanks in inland areas?

Yes absolutely. The sealant must resist salt and marine humidity, not standard sealant.

How often does a coastal tank need re-sealing due to salt and humidity?

Every 3-4 years full inspection may be needed. Salt speeds deterioration far faster than inland areas.

Is cleaning the tank of salt residue enough before new sealing?

Cleaning is essential but we may also need to remove a layer of salt-eroded concrete before applying new sealant.

How much does water tank sealing in Al Zumurrud cost?

It is set after the inspection, because the price follows the type of infestation, the size of the space, how far it has spread and the number of visits it needs. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Zumurrud.

Nearby districts we cover

Other services in Al Zumurrud

Other services we provide to residents of Al Zumurrud.

All services

Need water tank sealing in Al Zumurrud? Tell us what you saw and we will tell you what it needs

We reach Al Zumurrud at a time we agree, and you get the full cost before we start.

Call now +966 57 336 7012 WhatsApp